Case study

Wharf Road

Location: London, N1

Client: A2 Dominion Homes

Main contractor: United House

Consultant: URS

Contract value: £12M

Programme: 65 weeks

Brief

A full BIM design and build installation of all mechanical, electrical, smoke ventilation, and sprinkler services to a mixed-use development of 327 apartments and 9 commercial units. Work to include acentral energy centre and a full life safety system with generator backup, as well as green initiatives involving rainwater harvesting and combined power heat.

Scope of services

  • Energy centre with CHP providing heat to 327 apartments.
  • Heat Interface Units to serve hot water and heating and heat recovery unit.
  • Shell and core commercial units in preparation for fit-out by end user.
  • Lighting and lighting control with CCTV and fire alarm.
  • Heated flooring, HIU, LTHW, and CTW.

Solution

A complete design and build installation of 327 apartments, comprising Housing Association, shared ownership, and privately owned dwellings. To include shell and core fit-out of commercial units. This project received a BREEAM rating of “Excellent”.

Get in touch with Gloster MEP.

Call: 0207 089 6910
Email: enquiries@glostermep.co.uk