Contract value: £350k

Programme: 4 months

Brief

A new Cat B office fit out in the newly constructed Marble Arch Place.

The Works modifications to the base build LTHW and CHW FCU installation, install of new VRF system, domestic water services, new BMS controls installation, New Lighting, Lighting control system low level power and architectural lighting.

Scope of services

  • CAT B electrical services fit out of the Level 2 desk arrangement
  • New Lighting installation
  • Comms room installation
  • High level LTHW & CHW alterations and new FCU’s
  • New VRF Air Conditioning installation
  • New BMS Controls installation
  • New Domestic Water Services installation