Case study
Tate & Lyle
Location: London
Client: Parkeray
Main contractor: Parkeray
Contract value: £350k
Programme: 4 months
Brief
A new Cat B office fit out in the newly constructed Marble Arch Place.
The Works modifications to the base build LTHW and CHW FCU installation, install of new VRF system, domestic water services, new BMS controls installation, New Lighting, Lighting control system low level power and architectural lighting.
Scope of services
- CAT B electrical services fit out of the Level 2 desk arrangement
- New Lighting installation
- Comms room installation
- High level LTHW & CHW alterations and new FCU’s
- New VRF Air Conditioning installation
- New BMS Controls installation
- New Domestic Water Services installation
Get in touch with Gloster S-Worx.
Call: 0207 089 6910
Email: enquiries@gloster-sworx.co.uk