Case study

Location: London

Client: Essential Living

Main contractor: InnC

Contract value: £14M

Programme: 74 weeks

Greenwich Creekside

Brief

Design and build of 249 privately and socially rented apartments across two blocks with amenity space. Building construction is concrete core with full modular apartments.

Scope of services

  • M&E design of apartment modules.
  • Infrastructure connections and testing of apartments.
  • Residential infrastructure services.
  • Communal area design and fit-out.
  • External landscaping design and installation.
  • Car park and back-of-house areas.
  • 1.6MW energy centre.

Solution

  • Combination of 109Kw CHP and Twin 750Kw modular boilers.
  • Eaton intelligent lighting system.
  • Lower ground ventilation system.
  • Full excel standard structured data cabling system.
  • Fibre optic IRS.
  • Comilet door entry/access control system.
  • Honeywell notifier fire alarm system
  • Life safety generator and associated back-up systems.

Get in touch with Gloster MEP.

Call: 0207 089 6910
Email: enquiries@glostermep.co.uk