Case study

Location: London

Client: Essential Living

Main contractor: McLaren

Contract value: £6.3M

Programme: 12 months

Archway Tower

Brief

To provide 118 new residential units with communal living space and a basement energy centre. All of which achieved BREAAM “Excellent” standard.

Scope of services

  • Electrical and mechanical infrastructure to supply 118 new apartments.
  • On site energy centre with 4no gas fired boilers.
  • On site emergency standby 275Kva generator.
  • High pressure water mist system.
  • New electrical switchgear and rising busbar throughout.
  • Intelligent lighting control systems and LED lighting throughout.
  • Fibre optic data transmission system.
  • Multi-discipline TV/IRS distribution system