Case study

Location: Croydon

Client: Government

Main contractor: Paragon Interserve

Contract value: £8M

Programme: 24 months

Apollo Lunar House

Brief

Cat A fast track fit-out of 40 floors within a high security building. All personnel needed to be counter terrorism cleared.

Scope of services

  • Relocation of existing small power.
  • New distribution boards to serve new circuits, ensuring compliance.
  • Pipework alterations to new tea point areas, requiring pipe freezing due to age.
  • Install of new Vivreau hot taps to tea points.
  • Power monitoring to both buildings to determine and rectify voltage dips and spikes currently affecting the end user.
  • Relocation of reprographics and server rooms to include VRF, DBs and small power.
  • Café and restaurant relocation with new services afforded, including pumps to waste due to a technically difficult location.

Get in touch with Gloster MEP.

Call: 0207 089 6910
Email: enquiries@glostermep.co.uk