Case study
Location: London
Client: Blackberry
Contract value: £6M
Blackberry – Knights Level 6 Restack
Brief
A data centre installation for Blackberry, basebuild and fit-out.
Scope of services
- Dual supply 6 MW connection to ESB at MV.
- LV electrical distribution.
- Installation of two standby generators.
- BMS & EMS controls.
- Fire suppression system.
Solution
Delivered to a tight schedule without loss of services. Integrated systems test process.
.