Case study

Location: London

Client: Hermes

Main contractor: Overbury

Contract value: £11.5M

Programme: 9 months

Southbank Central

Brief

To provide a Cat A fit-out to office space which serves 8 floors on the Podium building and 9 floors on the Tower building, as well as new reception areas for both buildings. We also installed new toilets within both buildings.

Gloster MEP were employed as a design and build contractor and the buildings were being designed to achieve BREEAM “Excellent” standard.

Scope of services

  • Electrical, mechanical, and plumbing infrastructure to Cat A office space and toilets.
  • New cold and drainage to new toilets serving both Tower and Podium buildings.
  • New LHTH and chilled water services, feeding fan coil units.
  • BMS system to control room temperature via FCUs and new LTHW plant room.
  • New supply and extract system serving office space within both buildings.
  • New toilet extract system serving both buildings.
  • New office lighting.
  • New office lighting control.
  • New office general power.
  • Power to supply fan coil units.
  • Fire alarm for all floors.
  • Disabled alarm call points in toilet areas.
  • Disabled refuge.
  • Security/door access.