Contract value: £14M

Programme: 11 months

Hays Galleria

Brief

Hays Galleria was a refurbishment project with 15 floors of Cat A fit-out and full new MEP infrastructure. All of which had to achieve BREEAM “Excellent” standard. Hays Galleria is a listed building and was originally Hays Wharf and was part of London’s shipping industry. This project was delivered alongside Overbury, who Gloster MEP have a long-standing working relationship with.

Scope of services

  • Full replacement of the Heating Energy Centre and new roof plant areas housing ventilation and cooling plant.
  • New electrical distribution to serve Cat A floors and landlord areas.
  • New Generator to back up life safety systems.
  • New sprinkler protection to Hays Galleria public spaces.
  • New toilet cores across the project.
  • Intelligent lighting control.
  • Energy efficient LED lighting.
  • New fire alarm system.
  • New reception area within each building.