Case study

Location: London

Client: BW

Main contractor: BW

Contract value: £6.6M

Programme: 7 months

Local Government Association

Brief

The London Government Association building, originally built in 1928, consists of a basement, ground, 8-floor office accommodation, and rooftop plant. Remodelling was to be completed on all floors and an extension was to be completed on the seventh floor.

Scope of services

  • Complete replacement of plantroom.
  • Complete replacement of electrical and mechanical to supply 10 floors of commercial office infrastructure.
  • Extension to existing seventh floor.
  • 375kW boilers and direct hot water cylinders with a plate heat exchanger.
  • Intelligent lighting control systems.
  • LV panel modifications.
  • Installation of rising busbar.

Solution

A commercial office use refurbishment in Westminster, London. Electrical and mechanical commercial office infrastructure to supply 10 floors, mixed Cat A and Cat B fit-out. Designed to improve function and energy efficiency.

Get in touch with Gloster MEP.

Call: 0207 089 6910
Email: enquiries@glostermep.co.uk