Case study

Location: London

Client: Coventry University

Main contractor: Parkeray

Consultant: ABS

Contract value: £400,000

Programme: 12 weeks

Coventry University – London Campus

Brief

A mechanical and electrical fit-out of lecture theatres, offices, and teaching rooms for Coventry University’s London campus.

Scope of service

  • Full lighting control system.
  • Fire alarm and intruder alarm.
  • Disabled refuge.
  • VESDA system.

Solution

A full lighting control installation was provided for the project, together with power requirements throughout. All installed and commissioned on a tight programme of floor-by-floor handover.

Get in touch with Gloster MEP.

Call: 0207 089 6910
Email: enquiries@glostermep.co.uk