Case study
Location: Triton SQ, London
Client: Gazprom
Main contractor: IOR
Consultant: Hurley Palmer Flatt
Contract value: £4.5M
Programme: 6 months
Gazprom
Brief
A Cat B mechanical and electrical installation on levels 6-9 at Gazprom’s London office, including FCU modifications and an independent CHW system within the trades area. An electrical lighting control system and voice-activated fire alarm were also included.
Scope of services
Electrical:
- Small power.
- Specialist lighting control.
- Fire voice alarm.
- Gas suppression.
- Security and access control.
Mechanical:
- Modifications and additions to the existing four pipe FCU system.
- DX cooling to the comms and SER rooms
- A dedicated chiller and CHW pipework system to the trader’s desk
- Sprinkler, BMS, and public health installation.
Solution
The finishes specification on this project were of a very high quality. Gloster MEP provided a dedicated engineer to work with the architectural team to provide a snag free delivery.